Skip to content

Project stories

Blore Close: coordinating a hybrid structure in a busy neighbourhood

Different materials can play different roles within the same structure. At Blore Close on Thessaly Road, eight apartments and two commercial offices were delivered using a mixed timber-and-steel frame above a reinforced-concrete ground-floor structure, within a setting with restricted parking and a bus route.

2 min readBy The Technocrates team
Blore Close — Thessaly Road, London.
Blore Close — Thessaly Road, London.

Technocrates Construction is showcasing Blore Close in Thessaly Road, London as part of its UK project portfolio. Eight apartments and two ground-floor commercial offices.

Different materials can play different roles within the same structure. At Blore Close on Thessaly Road, eight apartments and two commercial offices were delivered using a mixed timber-and-steel frame above a reinforced-concrete ground-floor structure, within a setting with restricted parking and a bus route.

The project

Eight apartments and two ground-floor commercial offices.

Scope and delivery

A five-storey mixed timber-and-steel frame above a reinforced-concrete ground-floor structure. The brochure references historical Code Level 4 design requirements, not a current certification claim.

The construction challenge

Restricted parking and a bus route outside the site required coordinated operations.

What developers can take from this

Hybrid construction calls for careful interface design. Tolerances, connections, moisture protection and the order of installation should be clear across the relevant packages. Historical sustainability requirements also need to be read in their original context: a past project's specification is not a substitute for checking the standards applicable to a new scheme today.

Engineering-led construction, commercially informed

Technocrates brings design-and-build delivery together with practical construction planning and commercial awareness. Its multidisciplinary team supports clients from early project discussions through construction and handover, considering buildability alongside the ambitions for the finished scheme.

Every development has its own requirements. The lessons from this project provide a starting point for a conversation about another site, rather than a standard price or a promise of an identical outcome.

Explore the scheme

Blore Close is located in Thessaly Road, London. The project record lists a duration of 8 months. Read the full case study for the project scope and construction details, or book a discovery call to discuss your own development.

Useful for your next scheme? Share it.

Bring the right questions to your next project.

Discuss your scheme