Skip to content

Project stories

Chadwell Heath: combining new apartments with retained buildings

New-build capacity and existing character do not have to be competing objectives. Technocrates' Chadwell Heath scheme brings 45 new residential units together with refurbishment of two locally listed houses.

2 min readBy The Technocrates team
Chadwell Heath — Romford, London.
Chadwell Heath — Romford, London.

Technocrates Construction is showcasing Chadwell Heath in Romford, London as part of its UK project portfolio. 45 new residential units and refurbishment of two locally listed houses.

New-build capacity and existing character do not have to be competing objectives. Technocrates' Chadwell Heath scheme brings 45 new residential units together with refurbishment of two locally listed houses. That combination makes the interface between old and new a central part of the construction brief.

The project

45 new residential units and refurbishment of two locally listed houses.

Scope and delivery

Two new residential blocks of three to five storeys, with amenity areas, parking and landscaping. Piled foundations support steel framing with reinforced-concrete ground beams and composite metal-deck intermediate floors.

The construction challenge

Retaining locally listed dwellings while coordinating a substantial new-build programme.

What developers can take from this

Retained buildings should be treated as active design constraints from the outset. Their condition, access requirements and relationship to new structures can affect temporary works and sequencing. For developers, this is a reason to assess the retained fabric alongside the new-build appraisal, rather than leaving refurbishment as a separate package to resolve later.

Engineering-led construction, commercially informed

Technocrates brings design-and-build delivery together with practical construction planning and commercial awareness. Its multidisciplinary team supports clients from early project discussions through construction and handover, considering buildability alongside the ambitions for the finished scheme.

Every development has its own requirements. The lessons from this project provide a starting point for a conversation about another site, rather than a standard price or a promise of an identical outcome.

Explore the scheme

Chadwell Heath is located in Romford, London. The project record lists a duration of 24 months. Read the full case study for the project scope and construction details, or book a discovery call to discuss your own development.

Useful for your next scheme? Share it.

Bring the right questions to your next project.

Discuss your scheme