Wingfield Mews
Six high-specification three-bedroom houses.
The brief
Six high-specification three-bedroom houses.
Scope and delivery
The substructure comprises 65 reinforced-concrete piles and a 250 mm reinforced-concrete ground slab. Traditional brick-and-block walls work with steel columns, beams and engineered joists. The specification includes polished concrete, oak flooring, Selo doors, high-specification kitchens and walk-in showers.
Technical considerations
Delivering high-end finishes alongside coordinated structural and landscaping works.
Project record
Location: Peckham, London. Project duration: 15 months. Project descriptions are drawn from Technocrates Construction's published company brochure and website. Budgets, verified completion dates and client-approved outcome measures have not yet been supplied.