Our Projects

We have successfully completed an impressive variety of construction projects. We’ve built up a significant amount of experience over the years with a dedicated and experienced team that is able to deliver projects reliably, on time and within budget. Below are few of our featured projects:

Rosslyn Avenue, Barns

New Build- Construction comprises of a single large residential Bungalow with high finishes. Works included, below ground drainage including installation of attenuation tanks, Beam & Block Flooring, Structural Steel, Masonry Work, Timber Joists floors, flat & sloped green roof, Engineered Flooring, 1st & 2nd fixes to kitchens & baths, Carpentry Works, Connections to M&E services and external Landscaping works.

Rosslyn Avenue Project
Rosslyn Avenue Project
Rosslyn Avenue Project
Rosslyn Avenue Project

Wingfield Mews, Peckham

New Build- 2 Story Houses with high end finishes. The scope covers the development of Six 3-bedroom dwelling houses (C3 Use Class), private amenity space and associated cycle storage, car parking and landscaping. Substructure of the houses consisted of pile foundations and RCC ground floor slab protected with gas membrane. Superstructure consisted of traditional brick-block masonry external walls, structural steel to support timber posi joists for intermediate and roof floors. High-end finishes including polished concrete floors, Seana Oak wood flooring, High Spec Kitchens, and walk in showers.

Wingfield Mews Project
Wingfield Mews Project
Wingfield Mews Project
Wingfield Mews Project

Bombay Street, Bermondsey

New Build- Multistorey RCC Frame Building- The proposed development is the construction of 02 commercial and 18 residential units in two joint properties at 3-5 and at 7 Bombay Street. 3-5 Bombay Street will have four floors, including the ground. The ground floor will provide flexible commercial space and the first to third floors will provide 9 self-contained apartments. 7 Bombay Street will be constructed over 5 floors, to provide a further 9 self-contained apartments, also providing a flexible commercial space on the ground floor.

Bombay Street Project
Bombay Street Project
Bombay Street Project
Bombay Street Project

Chadwell Heath Road, Romford

New Build- Multistorey Steel Frame Structure. The proposed development will consist of 45 residential units in two blocks 4/5 storey high along with retention and refurbishment of two locally listed dwellings fronting High Road, together with parking, landscaping, and ancillary works.

Chadwell Heath Road Project
Chadwell Heath Road Project
Chadwell Heath Road Project
Chadwell Heath Road Project

Tower Bridge Road

New Build- 06 Flats, 03 Houses and 01 Commercial unit. Demolition of the existing buildings on the Site and Construction of 2/3 story new building adjoining units comprising of 03 houses, 01 flat facing Alice Street and a new three-story steel structre building with mansard level and basement facing onto Tower Bridge Road, to provide 05 flats and a retail unit at the ground floor with associated bin store, cycle storage, and landscape areas on the back.

Tower Bridge Road Project
Tower Bridge Road Project
Tower Bridge Road Project
Tower Bridge Road Project

Sandycombe Road, Richmond

New Build- The proposed development is to include the construction of 3-5 storey building comprising 20 residential apartments on the upper floors with commercial space at the ground & first floor. The Superstructure is designed as concrete frames consisting of flat slabs and columns for the first four floors with a lightweight metal frame for the top floor.

Richmond Project
Richmond Project
Richmond Project
Richmond Project

HITHER GREEN LANE

This new build construction of a 03-storey building comprising a commercial unit (use class A1) at ground floor, 4 two bedroom and 2 one- bedroom self-contained flats above, together with cycle parking spaces and refuse storage. Works included demolition of existing building, Underpinning, Ground beams and RCC ground floor slab. Steel structure, composite concrete metal decking floors, flat & pitched roof and connections to M&E services.

Hither Green Lane
Hither Green Lane
Hither Green Lane
Hither Green Lane

UPLAND ROAD

This project was in London’s one of posh areas with scope of demolition of existing East Dulwich hotel to provide 4 x three-bedroom dwellings (Class C3) including construction of the mezzanine floor level and associated landscape works. Technocrates provided the client a full turnkey solution through its professional team right from the start ensuring to meet high standard of quality within budget. The client was guided throughout in the decision-making process for each phase of the build until we handed over the keys of the finished houses.

Upland Road
Upland Road
Upland Road
Upland Road

JUBILEE STREET

The multistorey Design & Build project near to Royal London Hospital Whitechapel comprises the demolition of existing building with basement and construction of 09 apartments for private sale spread over ground, first, second, third and fourth floors. In addition, part of the ground and full basement area was finished to shell standard for fitting out as a commercial space. With very tight space and restricted logistics to erect a massive steel structure was a great challenge successfully met through the hard work of the entire operations team within short period of time. Good quality brick work and excellent workmanship astounded everyone when the building was unveiled for the first time by removing the scaffolding.

Hither Green Lane
Hither Green Lane
Hither Green Lane
Hither Green Lane

HIGGINS HOUSE

Higgins House was a new development on the southern fringes of Bermondsey, comprising 10 exclusive homes, 01 unique office space and 03 commercial units with basement storage. This project was built for the Orchard Homes Group with a prime specification and exceptional finish in one of London’s most desirable boroughs. The main challenge in the project was to mitigate the impact of construction vehicle traffic at a very busy traffic junction in Central London. A Construction Logistics Strategy was developed by the Technocrates’ professional team in line with the local authority’s rules & regulations to successfully erect a 5 storey building with basement as a landmark for the area.

Technocrates Construction Limited Project 10
Technocrates Construction Limited Project 10
Technocrates Construction Limited Project 10
Technocrates Construction Limited Project 10

Tessa Apartments

The project comprised demolition of existing 1960’s two-storey building consisting of 4 flats and the erection of four-storey residential building plus lower ground level (basement) to include 9 residential units with landscape areas and the provision of refuse/recycling storage. The site was in an urban proximity area which posed logistics issues at the site. Moreover, a large scale construction site was running to the front of this project. Despite delay’s due to party wall issues, the project was completed in a record time of 10 months.

Tessa Apartments
Tessa Apartments
Tessa Apartments
Tessa Apartments

Ladybird apartments

The Project 76-Eltham Road started in October 2016. It comprised of the construction of a new build 4-storey block containing 14 residential flats. Works included excavations, concrete piling, RC columns and composite steel structure, installation of pre-stressed hollow concrete plank floors, installation of lift and connections to M&E services and external landscaping. This site was in a busy area of schools and next to an elderly home. The site operations and logistics were managed accordingly to minimise disruptions.

Ladybird apartments
Ladybird apartments
Ladybird apartments
Ladybird apartments

Attar House

The project 179-Ilderton Road started in October 2015. The project comprised of the erection of a 4 storey (plus lower ground floor storey) building to provide x 2 business units (B1), 9 residential flats, cycle spaces, motorcycle parking, 3 car parking spaces, bin storage and associated landscaping. This project was next to a primary school and we learned to work with constraints of noise and impact of vibration due to construction activities. We brought our vast experience to the project, working closely with the design team, Local Authorities, supply chain, local community (Schools etc.), neighbours and the client to meet everyone’s expectations.

Attar House
Attar House
Attar House
Attar House

Harrow Road, Western Mews

A unique development of 2 commercial units and 6 luxury one, two and three bedroom apartments located in the heart of Maida Hill. Costa Coffee and Hot Pod Yoga are current commercial tenants on the ground floor lifting up the value of this building. The project started in June 2015. The site had very restricted access and it was hard to arrange deliveries due to a busy traffic route and pedestrian crossing adjacent to the site. We learned how to synchronize construction activities right at the corner of one of the busiest traffic junctions of London city.

Technocrates Construction Limited Project 4
Technocrates Construction Limited Project 4
Technocrates Construction Limited Project 4
Technocrates Construction Limited Project 4

Blore Close

New Build construction of 5 storey Mixed (Timber and Steel) frame building following code level4, comprised of 8 Residential flats. (4x1 Bedroom and 4x2 Bedroom Flats) and 2 Commercial Offices on the Ground Floor. Ground floor builds up with reinforced concrete structure and a top structure composite of steel and timber structure. This site was in an urban area with restricted parking and buses running in front of the site. The logistics and operations were designed to minimize the impact on the neighbourhood.

Technocrates Construction Limited Project 5
Technocrates Construction Limited Project 5
Technocrates Construction Limited Project 5
Technocrates Construction Limited Project 5

Birstall Road

New Build, Construction of Multi-storey building following code level4, comprising of 8 Residential flats. This site was adjacent to the Network Rails connecting Seven Sisters tube station. Network Rail Department closely monitored this site to ensure their standards right from start to the end of the project. We learned how to run sites adjacent to the big infrastructure of Network Rail.

Technocrates Construction Limited Project 6
Technocrates Construction Limited Project 6
Technocrates Construction Limited Project 6
Technocrates Construction Limited Project 6

Putney

New Build, demolition of existing house and construction of 3 stories 5-6 Bedroom detached house approximately 5000 sq. ft.
This site was in an urban residential area comprising large houses.

Technocrates Construction Limited Project 7
Technocrates Construction Limited Project 7
Technocrates Construction Limited Project 7
Technocrates Construction Limited Project 7

East Acton

New Build, Demolition of existing building and construction of 5 storey steel frame building comprising of 9 Residential flats. (4x1 Bedroom and 5x2 Bedroom Flats). The site was close to a busy traffic junction on the A40 road towards Central London. Managing logistics and site access for pilling rigger, steel structure and prefabricated concrete floors was a wellexecuted challenge.

Technocrates Construction Limited Project 8
Technocrates Construction Limited Project 8
Technocrates Construction Limited Project 8
Technocrates Construction Limited Project 8

Wellington House

Conversion of existing office floors into 37 residential dwellings comprising of 1&2 Bedroom flats. (Full Design & Build Contract).
The site was right in the heart of a commercial hub which was very busy with day to day customers.

Technocrates Construction Limited Project 9
Technocrates Construction Limited Project 9
Technocrates Construction Limited Project 9
Technocrates Construction Limited Project 9

Accreditations

Constructi Online
Safety Schemes in Procurement
Safety Management Advisory Services
BLP Insurance
Considerate Constructors Scheme
Federation of Master Builders

If you have any Construction problems, we are available

Technocrates Construction Limited can give fast, reliable and premium quality service for your project. Please feel free to contact us.